ALUSTEER guided pipe jacking projects

The ALUSTEER machine has completed guided bores of 10 to 60 m with pipes of 40 to 225 mm: under a national road, next to a gas pipe and medium-voltage cables, in stony and frozen ground. Each project has its location, figures and a site video. We do not name the companies operating the machine.

Drone view: launch pit with the ALUSTEER machine, reception pit and the PE pipe between them
Two pits instead of a trench along the whole length
Documented projects19
Locations18
Longest bore60 m
Pipe diametersØ 40-225 mm

Job sites and training

Documented projects

Obstacle type
    • Difficult ground and frost

    Zawoja

    Bore in stony ground. Difficult, stony terrain in the mountains.

    Length
    38 m
    Diameter
    Ø 110 mm
    Ground
    stony

    Filmed 05.2026

    Szczecin

    Socket pipe pulled on cables. Pipe installed on steel cables with a tensioner.

    Length
    20 m
    Diameter
    Ø 110 mm
    Pipe
    socket pipe, 6 m lengths

    Filmed 02.2026

    • Training

    Zawidów

    Bore and training after delivery. Training in operating the machine and navigation.

    Length
    over 40 m
    Diameter
    Ø 40 mm
    Pipe
    HDPE

    Filmed 11.2025

    • Next to underground utilities

    Żory

    Fibre optic next to a gas pipe. Pulling in fibre optic cable while bypassing a gas pipe.

    Length
    50 m
    Pipe
    fibre optic

    Filmed 05.2026

    • Under a road
    • Next to underground utilities

    Jarosław

    Bore under a road, next to MV cables. Medium-voltage cables avoided.

    Length
    12 m
    Diameter
    Ø 225 mm

    Filmed 05.2026

    • Training

    Bożepole Wielkie

    Training bore after delivery. Operator training on a full-scale bore.

    Length
    48 m
    Diameter
    Ø 125 mm

    Filmed 05.2026

    • Under a road

    Inowrocław

    Bore under a road, sleeve-jointed pipe. Pipes pulled in on steel cables with a tensioner.

    Length
    16 m
    Pipe
    sleeve-jointed pipe

    Filmed 04.2026

    • Under a road

    Toruń

    Bore under asphalt. No trench and no damage to the surface.

    Length
    35 m
    Diameter
    Ø 160 mm

    Filmed 04.2026

    • Under a road
    • Training

    Lębork

    Bore under a road. Machine delivery and on-site training.

    Length
    10 m
    Diameter
    Ø 110 mm

    Filmed 04.2026

    • Under a road
    • Training

    Pniewy

    Bore under a road. Operator training in real-world conditions.

    Length
    12 m
    Diameter
    Ø 160 mm

    Filmed 04.2026

    • Difficult ground and frost
    • Training

    Sarbinowo

    Training in frozen ground. Steering a curve against the resistance of frozen soil.

    Length
    30 m
    Ground
    frozen

    Filmed 03.2026

    • Difficult ground and frost

    Szczecin

    Ground with rubble and stones. Post-war site, hard ground, rubble and stones.

    Diameter
    Ø 160 mm
    Ground
    rubble and stones

    Filmed 02.2026

    • Under a road
    • Next to underground utilities

    Bielsk Podlaski

    Under a national road, above a sewer. Crossing above a storm sewer under a busy national road.

    Length
    30 m
    Diameter
    Ø 110 mm

    Filmed 11.2025

    • Difficult ground and frost

    Leszno

    Bore in winter. Frost and frozen ground, work without downtime.

    Ground
    frozen

    Filmed 02.2026

    Kuślin

    Bore powered by an excavator. Kit powered directly from the excavator.

    Length
    60 m

    Filmed 12.2025

    • City and green areas

    Warszawa

    Fibre optic under cobbles in the centre. Bore under cobbles with no trench in the city centre.

    Pipe
    fibre optic

    Filmed 07.2025

    • City and green areas

    Gdańsk, Oliwa Zoo

    Bore at the zoo. Launch pit away from visitor traffic, dry work, no digging up paths or greenery.

    Filmed 08.2026

    • City and green areas

    Włocławek

    Bore in the city centre. Dense development, crossings under streets and pavements.

    Filmed 11.2025

    • Under a road

    Białystok

    Large diameter under a road, in two stages. Several dozen metres under a road, bored in two stages.

    Filmed 10.2025

Playlist

Project videos

ALUSTEER job-site videos collected in one YouTube playlist. Open the playlist on YouTube

Videos

All ALUSTEER videos

Projects, deliveries, training and production in Gdańsk. All videos on YouTube

Ask about the ALUSTEER machine

Got a similar bore to do? Tell us the length, diameter and ground. We'll help you choose an ALUSTEER kit, and you can test the machine at the pipe jacking centre in Gdańsk.

Become an ALUSTEER dealer

Do you sell machinery to construction companies in your country? Find out how to become a dealer.

Become a dealer
FIJALO-POLAND

ALUSTEER® is a brand of FIJALO-POLAND, a manufacturer of machines for work on underground utilities. All brands on fijalo.pl